The successful Bidder shall provide all required labor, products, materials and equipment to remove the plants and soil in the 4 existing planters on the south-west (SW) corner of the property and 10 existing planters along Mike Fahey St and replace with new grasses, perennials, and plants and one tree as specified below. This includes removal of existing plants, root balls, and soil to be replaced with new plants, soil, hardwood mulch and rock mulch (SW planters only), along with identifying and repairing irrigation lines within these planters. SW Planters Plant Material: A. Baptisia False Indigo #1 - quantity 28 B. Allium Millenium #1 - quantity 60 C. Prairie Dropseed Tara #1- quantity 48 Soil: A. Clean Soil Containing 20% Organic material a. Four (4) planters, each 12’x12’. Remove & replace soil to a depth of 2’. b. Bidders will list the quantity, unit of measurement and unit price on the Attachment A - Proposal Form. Rock Mulch (SW Planters ONLY): For purposes of this bid, we have listed the quantities below. The successful bidder will determine actual quantities. Unit pricing from the bid will apply. A. 2” Trap Rock – 6tn B. 3”-6” Cobble – 1tn Mike Fahey Street: Plant Material A. Hydrangea Little Lime #5 - quantity 77 B. Prairie Dropseed Grass #1 - quantity 164 C. Nepeta Blue Wonder # 1 - quantity 160 Soil: A. Clean Soil Containing 20% Organic material a. Ten (10) planters, each 25’x12’. Remove & replace soil to a depth of 18”. b. Bidders will list the quantity, unit of measurement and unit price on the Attachment A - Proposal Form. Hardwood Mulch: For purposes of this bid, we have listed a quantity on the Attachment A - Proposal Form. The successful bidder will determine actual quantities. Unit pricing from the bid will apply. A. Twice ground, dark brown, hardwood mulch installed to a depth of 3” Poppe Plaza Tree Replacement: A. 2.00” caliper Japanese Lilac Tree