The work to be completed under this Contract consists of the following, located on the right side of the Pacific Highway (I-5) NB Exit 124 on ramps (2 adjacent on ramps), approximately between MP 124.1 and MP 124.5, in Douglas County OR: 1. Furnish and maintain temporary work zone traffic control. 2. Furnish material, equipment, labor, and incidentals required to fall trees, trim tree canopy, slash brush, remove vegetation, chip material and treat hardwood tree trunks and stems with herbicide. Remove foliage and debris deposited from felled trees, tree limbs, stems, and brush or as otherwise directed. See Exhibit 2 for further details and locations of the work to be done. 3. Perform additional and incidental work as called for by the plans and specifications, and as directed.