PORTAGE LAKES STATE PARK PATROL OFFICE REBUILD General Project Contents: PROJECT PREPARATION: Obtain necessary permits. Install portable toilet for duration of the job. Deliver dumpsters as needed for duration of the job, 15 cubic yards. FRAMING DEMO: Demo the underlayment on the subfloor where needed and seat all nails in the subfloor. MECHANICAL DEMO: Existing plumbing rough in the walls to remain as is. Existing electrical to remain as is throughout the house. EXTERIOR DOORS: Provide and install 2 exterior ProVia Heritage 4 raised panel w/ glass door units, fiberglass, 3-0 x 6-8. Door specs on attached sheet. To be installed at front door and kitchen door. Provide and install electronic keypad doorknob on both exterior doors. Provide and install sliding glass doors on the breezeway entry way. SIDING AND GUTTERS: Remove vinyl siding and repair wall structure damaged from tear out in two areas. BATHROOM PLUMBING: Rough-in 2 new toilet flanges in designated areas. Provide and install 2 Kohler Highline toilets, 2 pieces, elongated, slow close seat, in prepared location. To include new shut offs and supply lines Provide and install 1 Delta shower control set, single control, head, spout. Provide and install 1 Sterling Ensemble shower unit, Vikrell, 60" x 32", 72" tall, in prepared location...