001 01 71 13 Mobilization and Demobilization 1 LS 002 01 71 23 Construction Survey 1 LS 003 01 55 26 Traffic Control 1 LS 004 02 41 13 Site Demolition 1 LS 005 31 23 16 Excavation 1660 CY 006 31 05 13 Topsoil 70 CY 007 00 00 00 Landscape Boulder Retaining Wall 110 LF 008 32 12 16.13 Asphalt Pavement Section, 3” ACP / 8” UTBC 54,475 SF 009 32 92 00 32 01 90 Natural Grass One Step Hydro Seeding 57,200 SF 010 32 16 14 Pedestrian Access Ramp #1 1 LS 011 32 16 14 Pedestrian Access Ramp #2 1 LS 012 32 16 14 Pedestrian Access Ramp #3 1 LS 013 32 16 14 Pedestrian Access Ramp #4 1 LS 014 32 16 14 Pedestrian Access Ramp #5 1 LS 015 32 16 14 Pedestrian Access Ramp #6 1 LS 016 32 17 23 18" Solid Crosswalk Line, WHITE Pavement Marking Paint 240 LF 017 32 01 05 Install Sign: MUTCD R1-1 , STOP, 18” x 18” 6 EA 018 32 01 05 Install Signs: MUTCD R1-1 , STOP, 18” x 18” and “TRAIL ENDS”, 18” 2 EA 022 Rectangular Rapid Flashing Beacon, set of (2) 3 LS