1.) Mobilization. 1 LS $ $ Trail 1: Equestrian Access Trail 2.) Construct New Trail Tread. 4,254 LF $ $ 3.) Structured Climbing Turn Feature (switchbacks). 5 EA $ $ 4.) Climbing Turn Feature. 18 EA $ $ 5.) Armored Crossings (140 SF each). 4 EA $ $ Trail 2: Northeast Loop Lower 6.) Construct Trail Tread. 15,244 LF $ $ 7.) Structured Climbing Turn Feature (switchbacks). 7 EA $ $ 8.) Climbing Turn Feature. 7 EA $ $ 9.) Armored Crossings (140 SF each). 6 EA $ $ Fence and Gate Installation 10.) Metal Swing Gate Installation 1 EA $ $ 11.) Existing Steel Gate Relocation 1 EA $ $ 12.) Single Pipe Swing Gate Installation 1 EA $ $ 13.) Buck and Rail Fence Installation 300 LF $ $ 14.) Smooth 3-Wire Fence Installation 800 LF $ $