The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the Proposed 2023 CDBG Flooding, Street, & Drainage Improvements as shown on the construction drawings. In general, construction consists of approximately 1,261 L.F. of base and pavement widening, 975 tons of asphalt resurfacing, 2,900 L.F. of various size storm piping, 4,362 L.F. 24” concrete curb and gutter, catch basins, median inlets, storm manholes, erosion/sedimentation control and all associated measures for the complete project. Time allotted for completion of work is 180 consecutive calendar days to substantial completion. Work shall be complete and ready for contract close-out with 194 consecutive calendar days. All work shall be completed in accordance with the plans and specifications. The work will be located in two target areas and awarded in one (1) Contract.