The project scope includes removal and replacement of existing water services across Tenth Street, and northward along the east edge of Tenth Street. The proposed water utilities will connect to the existing water main where Tenth Street meets the Alley, and will provide service to Lots 1, 2 and 3 as shown on the construction drawings. The north end of the proposed water utility will terminate at a 6-inch plug with thrust block. The northernmost service line extending into Lot 1 will terminate at a frost-proof yard hydrant. Proposed materials include 6-inch diameter ductile iron pipe, 2-inch diameter high density polyethylene pipe and other appurtenances as shown on the construction drawings. In order to complete this work, open-cut trenching across Tenth Street is required. This will involve removal and replacement of asphalt pavement and concrete curb and gutter, as well as replacement of subsurface geotextile as shown on the construction drawings.