The Contractor will be required to perform prep work, removal, installation and cleanup for Bridge Maintenance and Repair defined in this ITB. The majority of the work will occur on the Interstate and State Route system. The Contractor shall supply labor, equipment, tools, means of transportation, traffic control, and incidentals to perform work in accordance to specifications, and to ensure a safe work environment for employees and the traveling public within the time schedule specified. Scope Work under this ITB consists of furnishing all labor, materials, tools, equipment, means of transportation, and incidentals necessary to perform the services. Contractor must furnish equipment in good operating condition and operated by properly trained and qualified personnel. The Contractor must make a good faith effort to furnish the Department the fully operational equipment needed to perform Bridge Maintenance and Repair at such time, and at such location(s) as directed by the Engineer. Prior to start of work, Contractor must inspect equipment to ensure the equipment is fully operational for the performance of its intended purpose. The Contractor will also be responsible for any traffic control, licenses, and permits required to satisfy the duties required herein. When replacing PCC Slabs, the contractor is not allowed to remove the existing slab without being able to puor concrete within seven (7) calendar days of opening the road surface. Deliverables Delivery of Bridge Maintenance and Repair shall be in accordance with the contract terms. The following deliverables are expected for work performed at the locations referenced in Exhibit 4 - Locations, Descriptions and Estimated Quantities. The use of temporary traffic control devices shall be as per section 150, the MUTCD, and the standards specified elsewhere in this contract