The scope of work shall include a complete assessment of the project, The vendor shall provide licensed, qualified personnel for any rehabilitation: A. Design and build Plans for the following objectives: b. Over all Building Objectives • Replace and remove HVAC System • Duct Cleaning of remaining duct work • Address the supplies and the return air throughout the dorm • Add the necessary exhaust fans to the restrooms throughout the building • Remove and Replace all Windows and Doors • Remove and replace all wood rot • Replace all Exits Doors on the building, that are beyond its useful life • Replace the (FCP) Fire Control Panel • Upgrades to the power distribution systems lighting and branch wiring • Replace all the emergency lighting • Update all electrical • Replace hot water Heater? • Update any plumbing as needed (restrooms may be redesigned with additional toilet, urinal and lavatories – IPC Table 403.1) • Update Sprinkler system • Add Flock Camera system • Replace the Shingle Roof with Warranty • Replace all downspouts and gutter system • Replace/Upgrade sidewalks and conveyance to ensure they are ADA complaint • ADA ramp that connects to Lower level (outside of building) • Add an awning to the front door of the building • Paint entire building (color to be chosen by City) • Replace exterior signage • Ensure that there are shut-off valves installed throughout the complex to enable isolation of all utilities • Pots line ran for Fire Alarm and Security Alarm (Cana) • Conduit lines ran for exterior doors for key card entry access