CHP Cordelia CVEF EB: • One (1) diesel generator, Kohler 255 KW, Model # 250REOZJE, Serial # SGM3233W4, Manufacturing Date: 10/12. • One (1) Transfer switch, Model: Eaton ATC – 300+, Serial #20120918F010010, Manufacturing date unknown. CHP Cordelia CVEF WB: • One diesel generator, Generac 200 KW, Model # 9214310100, Serial # 2096177, Manufacturing Date: 12/17/2007 Start of Contract includes service and material for the following: 1) Perform coolant flush includes: A. new coolant B. belts C. hoses D. thermostats E. radiator cap 2) Replace battery (put replacement date on battery/s). 3) Perform complete tune-up on engine to include: A. Replace spark plugs and spark plug wires. Annual Service Shall Include the Following: A. Change the oil and all filters (i.e., coolant, air, fuel, and oil). B. Sample the anti-freeze coolant in the engine and a supply report. C. Blow out the generator/alternator with dry nitrogen. D. Check the controller and all engine safeties. E. Clean and adjust the voltage relays. F. Lubricate the transfer switch mechanism with dry lubricant made for electrical devices. G. Provide resistive load bank service annually and prearrange time of load bank service with the Facility Commander/Coordinator. This should be a typical two-hour testing process. Quarterly Service Shall Include the Following: A. Service the battery and record the levels. B. Check the oil level. C. Check the water and anti-freeze levels. D. Check belt tension. E. Drain the sediment off the fuel filters and day tank. F. Check the battery charger. G. Test run system under building load. H. Check for leaks, make a visual inspection, and make minor adjustments. I. Touch-up paint if necessary to prevent equipment from rusting. Annual 480 Hour Service Shall Include the Following: A. Adjust the valves. B. Check the4 injectors and adjust timing and rack. C. Perform a complete tune-up on the engine. Annual Load bank service shall include the following: Provide resistive load bank service at the beginning of each contract year or at a time of mutual agreement with the CHP on-site contact. This should be a typical two-hour testing process to be done annually.