All Schools 1. Remove and haul away all existing flooring and base. 2. Install specified flooring per manufacturer’s instructions using manufacturer’s specified adhesives and will require all seams to be welded. Material must be delivered and acclimated a minimum of 48 hours prior to installation. All cutting and fitting to be done inside to reduce the chances of material expansion and contraction. 3. All carpeted areas to receive integrally welded Abrasive Action ll at all exterior entryways. No walk off mats or squares will be allowed. Area shall be a minimum of 6’ x 6’ at all single doorways, and a minimum of 10’ X 6’ at double doors U.O.N. 4. All walls at carpet and LVT areas to receive a Roppe or Johnson 4” topset cove base, except where noted otherwise. color Black. 5. All restrooms to have self cove Tarkett iQ Optima Homogeneous Sheet Vinyl. All seams including inside and outside corners to be welded using matching manufacturer rod. No caulking of seams will be accepted. 6. Adhesive for LVT to be Rollsmart or Taylor Dynamic Adhesive 7. Chase and WD Hall flooring areas to be removed and replaced must be assumed as Asbestos Containing. Removal to be done by a certified demolition company.