The Atwood Innovation Plaza Exterior Window & Door Replacement Project will install modern, energy-efficient windows and doors that match the existing storefront design. An abatement crew will remove and dispose of old units, temporarily securing openings with plywood, while the contractor will handle installation within 1-2 days of removal to minimize disruption. The contractor must verify measurements, ensure materials are on-site before work begins, and follow best practices for structural integrity, sealing, and insulation. Coordination with university personnel is required for proper door hardware integration. The project runs from May 5 to August 1, 2025, with strict adherence to timelines, building codes, safety regulations, and energy efficiency standards. A final inspection will address any deficiencies, and a warranty will cover materials and workmanship. The completed installation must seamlessly integrate with the existing design, enhancing aesthetics, security, and thermal performance. All correspondence must be made through the Vendor Portal.