Specifications include, but are not limited to: A. The Department will pay for the Sign at the Lump Sum price bid for this item. Price and payment will constitute full compensation for: 1. Excavating within the template of the item including the foundation; 2. removal and disposal of existing materials; 3. foundation preparation; 4. compaction; 5. providing and placing materials; 6. compaction; 7. providing forms and forming; 8. supplying, placing, finishing and curing PCC; 9. backfilling; 10. removing surplus materials; and 11. removing and replacing cracked or damaged curb. B. The Department will pay for; 1. Excavation and embankment outside the template of the item in accordance with section 202 at the direction of the engineer or as otherwise required by the contract 2. rock removal in accordance with section 202