Specifications include, but are not limited to:. The City of Pismo Beach seeks the services of a qualified firm or a joint venture of firms to conduct an underwater and above-water inspection of the entire Pismo Pier structure in accordance with the American Society of Civil Engineers Manual 130: Waterfront Facilities Inspection and Assessment, and the U.S. Department of Defense Unified Facilities Criteria 4-150-07: Maintenance of Waterfront Facilities. The City also seeks to have the Consultant conduct inspections of the Cypress Street Bridge, Dolliver Street Pedestrian Bridge and the Shore Cliff Pedestrian Bridge in accordance with National Bridge Inspection Standards (NBIS) and the Caltrans Bridge Element Inspection Manual.