• All work shall comply in every respect with the Building Laws, City Regulations, Code Requirements (either City, State, or National) and the requirements of the Massachusetts Department of Public Safety. • The contractor shall obtain and pay for all permits, licenses, etc., as may be necessary or required for the completion of the work. • All equipment, materials, etc., specified to be removed from the site shall become the property of the contractor, unless otherwise stated. • All repair work will be left in a safe and workable condition. • If there are any questions regarding the repair work that is to be done, it will be the responsibility of the contractor to contact the Worcester Public Schools Facilities Department or appropriate City Department and request clarifications before quoting job. • No single job shall exceed $10,000 under the terms of this contract. • The awarding authority reserves the right to cancel a purchase order if it appears that any job is not being performed as expeditiously as possible. • By executing this contract, the contractor represents that he has familiarized himself with the local conditions under which the work is to be performed. • In the event of accidental site damage, it will be the responsibility of the contractor to return the site to its original condition at no cost to the City of Worcester. • If temporary repairs are needed due to an emergency, the tradesman is instructed to do so at the direction of the Facilities Director or his designee. Any and all other work is to commence only upon receipt of a valid purchase order. • All permanent repairs must be made as soon as it is possible. This must be done as a minimum within five (5) days after the problem has been diagnosed and purchase order has been issued. • It will be the responsibility of the workman to leave the area in a clean, “broom swept” state. Worker must remove all debris generated while making the repairs.