• The scope of the work includes labor, material and equipment to sweep all town roadways utilizing 2 sweepers. Work will begin in April 2024 (weather dependent) and must be completed by May 2, 2025. Contractor will be responsible to sweep every town road, coordinate with the DPW for hydrant locations for water fill ups and coordinate material offload with DPW. Contractor will not be responsible to haul material away. Exact schedule will be determined by the Town based on weather. Quote should be supplied as an hourly wage per machine. Two machines will need to be supplied and the work will last 3 weeks. Each work day will consist of an 8-hour work day Monday – Friday between the hours of 7am to 3pm. • Contractor is required to track hydrant fills ups, gallons used, miles swept per day and total amount of material emptied.