The Project consists of process mechanical improvements at the existing Flow Control Building, Dissolved Air Flotation (DAF) Building, Filter Building, and Reclaim Pump Station. New piping, valves, actuators, and flow meters will be installed at the Flow Control Building to reduce headloss at increased plant flows. The existing DAF will be rerated from 40 mgd to 60 mgd and new recycle pumps, compressors, piping, and valves will be installed to accommodate increased DAF recycle flows. New filter inlet and waste backwash outlet valves and actuators will be installed at the Filter Building to replace existing aging valves. New pumps, piping, and valves will be installed at the Reclaim Pump Station to convey recycle water at increased plant flows.