This project generally consists of runway pavement reconstruction for the Runway 17-35 system at the Anderson Regional Airport. This project involves reconstruction of the secondary runway pavement at Anderson Regional Airport (AND). The secondary runway, Runway 17-35, is approximately 5,000’ long and 100’ wide with 25’ wide paved shoulders. The paved shoulders will be removed, and the pavement will be reconstructed using Full Depth Reclamation (FDR). The new FDR pavement section will include approximately 12,900 tons of asphalt at a depth of 4 inches. In addition, there will also be modifications to the lighting and electrical systems associated with Runway 17-35 and its connecting taxiways. Additional runway safety area grading is also included as an additive bid. The project will include demolition, paving, erosion control, lighting/electrical, and pavement markings