A. Contractor is to ensure all utilities have been disconnected prior to any demolition work. B. Clear each project site of trash and miscellaneous debris. The Contractor is responsible for the appropriate disposal of all materials from the site. The disposal of materials shall be disposed of in accordance with all local, state and federal regulations and laws. Debris shall not be used as fill, unless otherwise instructed by New Castle County. C. All holes are to be backfilled with clean fill (Borrow Type C). Demolition area is to be rough graded and leveled with 4” of topsoil and seeded with seed mix Number 3. All disturbed grass areas shall be raked, hydro seeded, strawed, and tacked after all work is completed. D. The Contractor shall avoid interference with road traffic. E. The Contractor shall preserve in operating condition active utilities traversing the Project Site and designated to remain. F. The Contractor shall bear all responsibility for damage attributable to him to the property or to any property upon or passing through the Project Site which has been designated to remain. Contractor shall be held responsible for any damage to adjacent properties. G. The Contractor shall use all means necessary to prevent the spread of dust during the performance of the work. He shall thoroughly moisten all surfaces as required to prevent dust from being a nuisance to neighbors and the public.