A. Work Included: The work to be performed by this Prime Contractor shall conform to the requirements of all of Division 00 and Division 01 as well as the Project Performance Specifications (Division 02 through 33), all sheets in Drawings and other related documents (addenda), and includes the furnishing of all supervision, labor, materials, tools, equipment, transportation, plan and services necessary therefore and incidental thereto to complete the project. If Reference is not made to a specific specification section, this does not relieve this prime contractor of his material obligation for specification sections that pertain to his work and are not mentioned herein. The work shall consist of, but not be limited to the following project procedures/scope: 1. The Audio/Visual Contractor is to accurately furnish, install and provide all Audio/Visual scope of work for the entire project per the plans and specifications, including but not necessarily limited to the following: Installation of Audio/Video equipment and components as specified in the bid documents to include: 1. Electrical outlets behind each of the video monitors as well as in the three upstaged floor pockets. A point of view camera in the back of the theater audience area. All hardware or materials necessary to complete the work, including, but not limited to mounting brackets, cabling, connectors, wire ties, tie bases, conduit, wire ways, or conduit as necessary to provide a clean, neat, and professional installation. All required seismic restraints following local building codes and regulations. This requirement includes but is not limited to the rack, and theater speakers. The scope of work is inclusive of installation, continuity (“copper testing”), and related warranties slash guarantees as described in these specifications. 2. Inspections: Inspections require 48-hour minimum advance notification for onsite IOR and 72 hours for special inspections. 3. Audio/Video contractor shall examine all drawings and specifications before executing the work. Audio/ Video contractor shall verify electrical power requirements conduits raceways and boxes and report any discrepancies and or conflicts to the architect. The A/V contractor shall check all factors including the design, function and performance of the system and be fully cognizant of the requirements.