Renovation and Addition of DPW Facility at 290 Forest Road, Northford. CT. Work to include renovation and an addition of Offices, Restrooms, Locker rooms. 01 GENERAL REQUIREMENTS 1 LS 02 EXISTING CONDITIONS 1 LS 03 CONCRETE 1 LS 06 WOOD, PLASTICS AND COMPOSITES 1 LS 07 THERMAL AND MOISTURE PROTECTION 1 LS 08 OPENINGS 1 LS 09 FINISHES 1 LS 10 SPECIALTIES 1 LS 12 FURNISHINGS 1 LS 22 PLUMBING 1 LS 22A PLUMBING ALLOWANCE 1 LS $53,000.00 23 HEATING, VENTILATION AND AIR CONDITIONING (HVAC) 1 LS 23A HVAC ALLOWANCE 1 LS $65,000.00 26 ELECTRICAL 1 LS 26A Electrical Wiring ALLOWANCE 1 LS $42,400.00 26A Electrical Fire Alarm ALLOWANCE 1 LS $29,150.00 31 EARTHWORK 1 LS 32 EXTERIOR IMPROVEMENTS 1 LS 16 Evening Meetings (if needed) 50 HR