This project will demolish the original red-tagged structures of approximately 9,000 sf and construct a new *15,400 sf three-story Type IIB, concrete and steel student recreation building. The first floor is embedded into the hillside and the second floor is connected to the upper level recreational area. The new building will create strong connections between indoor and outdoor spaces, taking full advantage of its natural setting and providing ADA access to multiple site levels. The first floor includes an all gender restroom, a family restroom, office and conference room, a lactation room, along with two +/-2,000 sf multipurpose rooms each with dedicated storage. The first floor also includes an electrical room with an associated step-down transformer, custodial, mechanical, and IT spaces, conference room, and a small staff office. The second floor includes a ~ 2,500 sf multipurpose room with dedicated storage, and a demonstration teaching kitchen. The third floor includes approximately +/- 4,000 SF covered roof deck with an outdoor kitchen and BBQ with a steel structure and photovoltaics panels covered canopy. All levels are served by a three-stop elevator and stairs. Circulation areas are covered but unenclosed and open to the outside. Site work includes new hardscape, site stairs, landscape ground covers, new trees and concrete and wood seating areas. The recreational site complex surrounding the new building will remain occupied and operational during construction and the CM/Contractor shall identify occupants impacted by work. Work may be sequenced and phased to maintain existing site occupant and facility operations. Hazmat abatement is required. The building will obtain a minimum LEED v4 Gold rating with the goal of a Platinum rating. *Total Construction Area equals the sum of all enclosed, structural, covered unenclosed floor area.