• The Contractor shall furnish all labor, materials, tools, and equipment necessary for a complete repainting job in accordance with the project specifications It is the intention of these specifications to have all existing painted surfaces repainted. • It shall be the responsibility of the contractor to provide approved storage for materials and equipment at a location approved by the owner. • All staging, scaffolds, ladders, etc. shall always be maintained in a manner to meet OSHA Safety Requirements and not be a hazard to Murrieta Valley Unified School District Staff. Adequate exits from all buildings shall be maintained in all areas to meet the Fire Code. • All non-painted areas such as scrubs, floors, glass, etc. shall be protected. Upon completion of the project, the contractor shall remove all splattering and removal all paint-related trash from the premises. The contractor shall be held responsible for any related damages. • Exterior surfaces shall be pressured washed @3000 PSI to insure removal of chalk, mold, mildew, or any other foreign material. All surfaces after having been properly cleaned and de-scaled shall have all joints resealed by proper method as defined in the project specifications.