Replace indicated flooring (only orange and yellow highlighted sections of attached map) of Building 8N located at 480 Galletti Way, Sparks Nevada 89431. This work must be done by June 30, 2025. Flooring material will be hard tile in yellow sections of the map, the hard tile should closely match the existing hard tile in the white sections of the map. Flooring material will be carpet tile in orange sections of the map, the carpet tile color and material are to be determined. Furniture will be moved by Sierra Regional Center maintenance personnel. Sierra Regional Center will select the color of the flooring upon walk-through. Using flooring diagram, remove existing hard flooring and replace with new authorized flooring. Yellow sections will need to be replaced with hard tile that matches existing tile in white sections Orange sections will need to be replaced with carpet tile, these sections will need to be transitioned or leveled to best accommodate the transition between carpet tiles and hard tiles. Replace baseboards and thresholds with new materials to match existing newer baseboards and thresholds in white sections. Vendor will: Provide basic floor prep to install new flooring. Supply and install new tile and carpet. Supply and install new baseboard. Supply and install transition strips as needed. Provide tarp or plastic for wall and trim protection as needed. Remove all trash and debris from jobsite when project is finished.