The Work includes but is not limited to the following: Installation of electric vehicle charging stations in multiple locations across Port of Seattle properties. Fiber optic and copper communications, testing and labeling, installations of RG-6 Coaxial and Heliax and innerducts often co-located with SYSTIMAX™ Cables in raceways and junction boxes. Within 72 hours (3 business days) of receiving written request from the Port of Seattle, the Contractor shall furnish all cost estimates, which shall contain estimates for labor, tools, equipment, materials, and incidentals necessary to perform work as required by the Work Authorization (WA). Work will generally be requested on a day by day or weekly basis, but emergency response capability is also required. When emergency requests are made, one or more equipped trade workers must report to the designated job site within a time not to exceed two (2) hours from the time the Port Construction Manager calls the Contractor.