The following scope of work is being proposed for the Merrow Road Reconstruction Project for the City of Auburn. The scope of work is a brief overview of the expected extent of work included in this contract. Merrow Road Reconstruction Project – Base Bid ▪ The construction of approximately 1.3 miles of full-depth roadway reconstruction. o Work includes provisions for a right-turn lane on Merrow Rd at its intersection with Hotel Road. ▪ The installation of an 8’ (span) x 6’ (rise) x 65’ (length) precast concrete box culvert (clamshell style) and associated grading. o Culvert construction is subject to USACE Self Verification Notification Permit requirements, and all instream work must be completed between July 15 and September 30. ▪ Provide slipform concrete curb with appropriate curb tip downs. ▪ Install new guardrail over the proposed precast concrete box culvert. ▪ Provide drainage improvements, including new catch basins, pipes, underdrain, and ditches. ▪ Provide new striping and updated signage within the project limits. ▪ Loam, seed, and mulch as directed. Merrow Road Reconstruction Project – Bid Alternate #1 ▪ Adjustment of water and sewer structures within the project limits.