Scope: The successful contractor shall: 1. Become familiar with existing track installations and condition. 2. Become familiar with this Request for Bids document, with attachments. 3. Clean the track of all debris. 4. Perform miscellaneous track surface repairs in various locations around the track. 5. Fill and seal existing cracks 6. Provide and install two coats of Red Polyurethane Structural Spray at a total rate of 3.6 lbs per square yard to existing track surface area. The coating shall consist of 0.5 to 1.5mm EPDM rubber granules and red pigmented aliphatic polyurethane. 7. Provide an ASBA Certified Track Builder to manage the resurfacing work. 8. Provide line striping and track markings, including all existing lettering and markings, in accordance with NHIAA guidance.