Work under this contract entails the replacement of wood pole assets that are at the end of serviceable life. These poles are rated as P1 and P2 meaning they have a potential of imminent failure. Associated primary conductors and pole equipment such as transformers, switches, services and other appurtenances will be transferred or replaced as part of the replacement work. Issued Work Packages may include but are not limited to the following work tasks: • Site preparation: o Installation and maintenance of temporary erosion and sedimentation controls, temporary services and safety measures including but not limited to barricades, fencing, and plating of excavations. o Installation of all tree and landscaping protection measures. • Site demolition, removal, and legal disposal: o Vegetation and waste soil • Demolition of existing wood pole assets and associated equipment: o Wood poles o Pole foundations o Down-guys and anchors o Wood or fiberglass cross-arms o Overhead transformers, cut-outs, switches, and other protective devices o Electrical conduits for underground terminations and service drops, wiring, and conductors o Secondary services o Steel trusses or other bracing equipment o Electrical vaults o Handholes...