Demolition of approximately 40,000 SF of existing splash pad, landscaping, trees, flatwork, parking lot and other items required to prepare site for new construction and operational new 11,055 SF fire station complete with (3) bays and staff area for proper operations; Mechanical, electrical, plumbing, and low voltage systems. Off-site construction, signalization; a new (approximately) 500 SF multi-use conference room complete with signage, parking area, landscaping and appurtenances including utility pioneering and on-site work; includes coordination Locution Systems as required for fire station operations; includes coordination with Owner vendors (installation); flagpole, digital sign, perimeter fencing, trash enclosure, mechanical yard and tank enclosure and associated equipment. Maintaining existing landscape during construction and ensure all systems modifications follow the construction documents.