Main Stage Generator Quantity (1) 60kw (minimum) trailer mounted entertainment style generator • Unit must be mounted on a trailer. • Unit must include external spill berm for resource protection. o Double-walled tanks with the bottom being able to hold 110% of the unit’s fluid capacities may be accepted. Please provide applicable documentation with response, if opting for this solution. • Generator must have power distribution to include: o 60amp, 3phase camlock disconnect for stage production. ▪ 40’ feeder between generator and upstage right. o GFCI Circuits to include: ▪ [1] 15amp circuit for FOH tent • 150’ cable from generator to FOH. ▪ [5] 15amp circuits for [3] Artist tents and [2] Stage Management tents backstage • 25’ cable between generator and artist tents (upstage Right). • Sound level must not exceed 58 dBA at twenty-one feet. • Sufficient fuel to run generator for the following times are: o Friday, May 23, 2025 – 1:00pm – 4:00pm o Saturday, May 24, 2025 – 8:00am-7:00pm o Sunday, May 25, 2025 – 10:00am-8:00pm • The stage will be a SL100 (provided by another contractor).