The 2025 PCC Reconstruction Program – NW 9th Street project includes pavement reconstruction and utility improvements along NW 9th Street from approximately 375 feet west of NW School Street to just east of NW Logan Street in the City of Ankeny. The construction improvements include the slip-form paving of approximately 3,400 SY of 8” thick PCC Class C-SUD street pavement, approximately 950 SY of 7” thick PCC Class C-SUD intersection handwork, 275 SY of 6” thick PCC Class C residential driveways, 250 LF of 54” storm sewer, 250 LF of 48” storm sewer, 400 LF of 24” storm sewer, and 150 LF of 12” storm sewer. Other associated improvements include Class 10 excavation, subgrade preparation, modified subbase placement, subdrain installation, removal and replacement of storm sewer structures, removal and replacement of water valves, ADA compliant sidewalk ramps, temporary surface restoration, compost amendment of existing topsoil, permanent surface restoration, temporary traffic control, mobilization, and miscellaneous associated work necessary to complete the project.