Two mobilizations. The streets noted on the map to have curb replaced this spring and are not to be overlaid until September or later to prevent damage to the new curb. ● 124,620 sq yds of full width milling. ● 13,800 tons of 2” Type 5 Recycled overlay. The asphalt price will be indexed as per the Measurement and Payment section of the RFP. A sample from the field shall be pulled within the first 500 tons to determine Marshall properties and conformance with the submittal. ● Tack oil is to be UltraTack, Trackless Tack NTSS-1HM manufactured by Blacklidge applied at the residual rate of .06 gal/sq yd, CAT-TAC trackless tack manufactured by Hunt Refining applied at the same rate, or other approved trackless tack oil. Paving will not begin until the tack has broken. ● Milled surface is to be cleaned by a vacuum sweeper immediately prior to tacking. ● 750 tons of full depth patching, Type 5 Recycled asphalt. The quantity of patching necessary will be determined after each street is milled. The asphalt price will be indexed as per the Measurement and Payment section of the RFP. ● 11800 Sq. yds. of Type II Micro Surface on Dean. Steel slag aggregate is required. ● 500 linear feet of deep crack repair. The quantity of crack repair necessary will be determined after each street is milled. ● Re-striping of Dean after overlay