The work that is the subject of the bid comprises the overlay of two collector streets (the “Work”) for the 2200 West and 7000 South Overlay Project. The Work includes milling and overlaying portions of 2200 West and 7000 South; the lowering and raising of utility manholes, valves, and monuments; replacing ADA ramps; repairing or replacing curb and sidewalk; and installing traffic markings and striping per plans. Work must be conducted after school ends in June and be complete before school begins in August. The Contractor shall obtain all required and necessary permits to perform the work, including obtaining and following UTA and UDOT requirements under such permit(s). Contact Shelley Nielsen with UTA for questions regarding UTA permitting at snielsen@rideuta.com or 801-237-1991. Contractor cannot perform work or store any equipment or materials on or adjacent to 2200 West between the dates of June 30 to July 5. West Jordan Events festivities will be using 2200 West excessively during this time frame and the road will need to be useable at such time.