Work includes but is not limited to: 1. Good faith asbestos inspection(s) and testing to comply with RCW 49.26.013 as required to achieve scope of work. 2. Removal and replacement of all existing roofing materials and 25% of plywood deck sheathing as well as 100 LF of fascia boards. 3. Inspect all exposed roof framing for any rot or damaged materials and repair as needed. 4. Block and seal any existing gable vents from attic interior. 5. Provide and install new ½” CDX plywood deck sheathing and roofing materials according to manufacturer’s recommended installation specifications. 6. Provide and install all new CertainTeed roofing system components: a. Install CertainTeed Winterguard Ice and Water roof underlayment to all critical areas and valleys. b. Install CertainTeed Roof Runner synthetic roof underlayment. c. Install CertainTeed Landmark AR composition roofing system. 7. Install Cor-A-Vent IN-Vent Attic Roof Vent or approved equal. 8. Install all metal 24-gauge flashing components according to manufacturer’s recommendations including roof penetration flashing, roof to wall flashing, eave and rake flashings and W-Valley flashing. 9. Install permanent fall arrest/restraint roof anchors and all other accessory items to complete the installation and maintenance of the roof in a safe and secure manner. 10. Install new fascia boards where there is any decay or rot that would prevent the exterior paint to be applied and warranted. Include painting of all fascia prior to installation of new gutters. (See Section 1.7 UNIT COSTS for details.)...