Task One – Trenching/Concrete There will be approximately 100’ of trenching, and must have a cultural monitor on site at all times of soil disturbance. Must install a 15’x 25’ x 4” concrete slab, with #5 rebar at 18” on center. Concrete must meet 3500 PSI compression strength, must take three cylinders for testing. Task Two – Installation All wiring, conduits, auto-switch and other electrical equipment will be properly sized and installed in accordance with Federal State and Local code. All wiring, conduits and other electrical equipment will be installed in a neat and organized fashion. Unsatisfactory work will not be accepted by owner until rectified by the Contractor at their sole expense. All wiring and equipment will be clearly and properly marked as to known purpose. Contractor must supply and install appropriately sized propane fuel tank/tanks and all necessary plumbing. Task Three – Clean up All manuals and information on the unit will be submitted to the owner at the completion of the project. A general walk through of operation will be done with Tribal employees. All equipment will be inspected by an Owner representative throughout the project and testing will be successfully completed before the project is considered satisfactory. Any damage to the facility and/or equipment as a direct result of the project will be repaired by the Contractor. All remaining project debris and materials will be properly disposed of, by the Contractor, at this time and the area will be left in a condition equal to or better than found.