: Schedule A: The work consists of the rehabilitation of 500 LF of existing 24” corrugated metal sewer main piping. This rehabilitation will utilize Cured-In-Place piping (CIPP) to create a new liner within the existing pipe. This pipe is located beneath North Main Street in Pocatello, Idaho and runs beneath existing Union Pacific Railroad (UPRR) tracks. The rehabilitation work will include pipe and manhole cleaning, sewer bypass pumping, the installation of a pre-liner, and the CIPP construction. Traffic control and coordination with UPRR will be required. The project has a set deadline for September 30 for final completion after the Notice to Proceed. Schedule B: The work includes the rehabilitation of 3,290 linear feet of 8-inch and 791 linear feet of 12- inch diameter existing sanitary sewer pipes with Cured-in-Place Pipe (CIPP) installation, including cleaning, closed circuit television (CCTV) inspection, cutting off protruding laterals, lateral reinstatement, bypass pumping, traffic control, and other associated work.