1. Demolition and Site Preparation • Remove and dispose of existing millwork, including cabinets and countertops. • Remove whiteboard and outdated data outlets. • Remove IT items such as projectors and phones (to be handled by the owner). • Remove existing flooring and properly dispose of all debris. • Provide and place necessary dumpsters for disposal of materials. 2. Casework Installation • Install new plastic laminate (Plam) wall cabinets for faculty storage. • Install new Plam base cabinets with Blizzard Granite countertops for food preparation and workspace. • Install new Plam tall cabinets with locks for secure storage. • Ensure casework is protected post-installation. • Apply appropriate caulking at casework and countertops. 3. Flooring and Finishes • Prepare flooring surface, including grinding and scabbling as needed. • Install new carpet tile as per project specifications for a comfortable lounge atmosphere. • Remove and replace 6-inch rubber base for improved finish. • Minor touch-ups and repairs to gypsum board assemblies. • Remove and reinstall ceiling tiles as necessary for plumbing and electrical access...