The District is seeking to select a firm interested in providing construction services for Phase Two of the Innovation Academy Remodel. Contractor will be expected to start immediately after award of contract. The proposed remodel includes the construction of new classrooms, teacher’s offices, remote learning pods, and an exterior metal awning (at the outdoor eating area). A new unisex restroom core will replace the existing. Above the new classrooms, a mezzanine is proposed to expand the existing. A new mechanical equipment platform, accessible from the mezzanine, will be built. A new LULA elevator will be installed to access the mezzanine area. Additionally, the building will be seismically retrofitted with an exterior metal frame system at the existing concrete tilt-up wall panels. The existing fire sprinkler system will be modified, and extended to the new interior spaces. A new dry fire sprinkler system will be installed at the new exterior awning. The design of the fire sprinkler systems will be design-build by a fire protection subcontractor. The existing fire alarm system will be modified, and extended to the new interior spaces and the exterior awning/patio area. New mechanical units will be installed on the roof, and on the mechanical equipment platform. Existing plumbing and mechanical systems will be modified, and extended to the new interior spaces.