for furnishing the necessary labor, materials, equipment, tools, and guarantees thereof to construct the N Brown and E Washington Stormwater Retrofit project. This contract calls for installation of subsurface stormwater infiltration trenches, 6-inch storm sewer pipe, 8-storm sewer pipe, five type 1 catchbasins, 2 concrete stormfilter catch-basins (each with three filter cartridges), one coalescing plate oil/water separator, sawcutting, concrete demolition, asphalt demolition, landscape restoration, and restoration of pavement, sidewalk and curb and gutter, and temporary traffic control, and other associated work. The work locations include but are not limited to: N Brown Rd at E Washington; E Washington at S Brown Rd