-Demo interior of structure on main floor back to brick walls, and original tongue and grove ceiling. -Demo all interior Walls except walls marked in Red on page 4 of attached drawings. -When interior wall joins exterior wall, the entire wall should be demolished back to a clean finish of the exterior wall. -Center main wall has archways. These walls will be taken back to original form. -Demo all drop ceilings on top floor. -Demo all framed ceilings located above the drop ceiling. -This included the framing and supports. -When complete with ceiling demo should be open back to original bead board ceilings. -Demo all carpet flooring, tile flooring in bathrooms. See abatement of asbestos below -Abate all Asbestos as follows. This must be performed by an asbestos licensed contractor and follow all state and federal regulations. -Base bid to include 2000 square feet and also give a per square foot price for any overage of underage’s the base bid for flooring under carpet. -Bid to include flooring in safe area (approx. 600 sf) that needs to be abated. -TSI Piping in basement approx. 500 sf -TSI Aircell piping in basement approx. 200 sf