Contractor Shall 1. Provide all labor, equipment, materials, tools, transportation, and incidentals necessary to complete the work in this agreement to the standards identified within and to the satisfaction of the DNR Project Supervisor. 2. Sourcing of all parts including specialty parts required to install replacement pump into the pre-existing apparatus shall be done by the approved vendor. 3. Installation of the pump and all necessary components. 4. Bid shall include all equipment and incidentals needed to complete the project to the satisfaction of the DNR Project Supervisor. 5. Parts required include, but may not be limited to: a. Pump end rated at 400 GPM b. 15 HP 230V motor c. Approximately 115 feet of 6-inch black threaded and coupled (T&C) drop pipe and fittings d. 6” check valve e. Miscellaneous materials such as drop pipe and fittings, valves, wire, splice kits, tape, chlorine and pipe straps. f. Labor hours...