Ductwork is a total of 84’ long, 39” high and 53” wide. Removal and proper offsite disposal of existing insulation/protective covering, the site layout shows where the Contractor could place their dumpster. We believe the insulation for removal is enclosed in a fiberglass shell. Daily site cleanup of work area. Provide and install 3” Styrofoam board with R-15 value or equivalent insulation. Provide and install a protective covering on the insulation so it is enclosed in an embossed ventureclad jacket or equivalent. Contractor will be responsible for meeting all state and local codes relating to the project. Contractor will be responsible for obtaining and paying for any required permits. One-year material and workmanship warranty. Work hours will be Monday – Friday (with the exception of holidays) from 8:00am – 4:30pm CT.