Louisville Water Company is requesting Bids for the construction work for cleaning and replacing the liner of two basins of the 106-Million Gallon Crescent Hill Reservoir. Work is a combination of lump sum and unit price. One basin must remain in service at all times. Work includes but is not limited to draining the reservoir (one basin at a time) by pumping water to in-service basin, disposal of 128,000± CY of Water Treatment Residuals, removal of existing RPP liner system, preparation of basin surface for new HDPE liner – including repairs to existing concrete underlayment, application of 2,000± SY of elastomeric membrane coating, installation of 88,000± SY of new HDPE liner system, rehabilitation of existing pedestrian bridge, rehabilitation of existing sidewalks, and maintenance of traffic, repaving, and restoration.