The Town of Wolfeboro Municipal Electric Department will be accepting sealed bids for rightof-way trimming and re-clearing for 2025. Approximately 10 miles of electrical distribution (right-of-way) maintenance is scheduled for the oncoming season. Additional work will include on and off-road, island, new construction, hourly and takedown work. Based upon the anticipated 2025 workload, two (2) crews will be required for the majority of the trimming season. All right-of-way trees and brush will be ground cut to its pre-existing width or 20 feet (whichever is wider) and trimmed as required with no overhang unless specified differently on assigned work order. Secondary service wires (120/240 volt) will not be trimmed unless specifically noted on assigned work orders. When specified they will be trimmed to eliminate limb contact, (three feet on all sides.)