Main Water Line Extension: Install extension to existing water line to accommodate system upgrades. Lines will be painted on the ground where the installation of the water line will need to be. All necessary parts and supplies for the main water line will be provided by Uintah County. o Install six new zones to the existing sprinkler system for the planting of new grass, ensuring adequate coverage for the designated area. o Install underground hose taps to ensure convenient access to water throughout the landscaped area. o Install trust blocks at every Tee connection coming from the main water line to sprinkler valves. o 5‐year warranty on installation. Irrigation line: Install 460 feet of irrigation line along the north side of the alfalfa field to support a wheel line system. All necessary parts and supplies for the irrigation line will be provided by Uintah County. o Excavate and cap the irrigation line risers along the North side of the cemetery Ground Preparation: Remove vegetation, prep, and level ground for Hydro‐Seeding. o Perform Hydro‐Seeding with Dura‐Turf Seed Blend from Agrono‐Tech Seed Company.