The Project is generally described as the construction of emergency egress and miscellaneous improvements to classrooms 32, 34, and 142.The work includes, but not necessarily limited to the: 1. Remove the existing exterior windows and sawcut new openings through the concrete walls and provide egress doors for classrooms 32 and 34 on the ground floor. Provide new exterior landing with steps and accessible ramp out to the play yard; 2. Sawcut new opening through the existing concrete wall and provide one new egress door for classroom 142 on the first floor. Provide exterior metal staircase assembly including concrete footings; 3. Remove a low wall in room 142 and install new casework including repairs to the interior walls and floor finishes. Remove existing power and data cabling and modify to accommodate new work; 4. Remove and modify the existing cabinets in rooms 32 and 34, including repairs to the interior walls and floor finishes; 5. Reconfigure the toilet partitions in the Boys and Girls toilets on the ground floor to provide ambulatory stalls; 6. Perform hazardous materials and lead paint abatement as described and specified in Specification Section 00 31 26.