The City of Washington is seeking bids from qualified contractors for the re-routing and installation of new water transmission lines around the Solente development. The project involves replacing five main transmission lines with 3 new upsized lines, including a 20” & 24” line along Washington Parkway, extending 2,310 feet east from Main Street, then crossing Washington Parkway and heading 1,750 feet north with a 24” & 16” water line to the existing water tank. Additionally, the project includes rerouting the well line along Colima Road for 1,835 feet to the water tank site. In total, approximately 7,585 feet of various-sized water transmission lines will be installed. The existing transmission lines must remain in use until the new system is fully operational. Interested bidders must demonstrate experience in largediameter waterline installation and coordination with active utilities.