The following contractors have been prequalified to submit proposals on this project and UCDH will ONLY receive proposals from the following: Bid Package 5.1 – Demolition and Abatement • AMG (Asbestos Management Group) • PARC • Swinerton Builders; The UC Davis Health Medical Campus Operating Rooms Integration Modernization project will be constructed via Progressive Design-Build method. The UC Davis Medical Center, located in Sacramento, has a 50-year history of providing high-quality surgical care to patients across the greater Sacramento region and the 33 counties it serves. UC Davis Medical Center is ranked among the U.S. News & World Report top 50 in Cardiac, Lung, and Neurosurgery and designated High Performing in several other surgical specialties. The Surgery & Emergency Services Pavilion (SESP) OR Integration Modernization Project would address needed upgrades to the OR Lights/Monitor booms due to boom failures beyond the ability to repair and/or replace parts. In the SESP, the project will upgrade the OR Audio/Visual Technology within the twenty-four (24) Operating Room including combining the AV network head end equipment into one new centralized AV Room. Two (2) of the twenty-four (24) Operating Rooms will require conversion to Cardiovascular Operating Rooms (CVOR’s), two (2) of the twenty-four (24) Operating Rooms will require conversion to Flex-Case Operating Rooms (FCOR’s) and one (1) will require conversion to a Hybrid OR. These modifications require reconfiguration of the rooms boom orientations, structural components, med gas needs, laminar air flow and technology upgrades. Replacement of headwalls in 63 preop/ pacu bays along with renovation of the ICU/ Surgery waiting room are also included in the scope. Bid Package 5.1 – Provide all Demolition and Abatement required per scope. 2 of the ORs will be a full demo. 1 of those ORs will have lead abatement removal. 2 Other ORs will have demolition of ceilings and drywall removal on inside of walls. Other 19 typical ORs will just have a boom equipment replacement below ceiling. Also includes demolition of existing wall protection & drywall where required in other areas. Reference scope of work, plans, and specification included project files on building connected. Scope includes but is not limited to section 02 41 00- Selective Building Demolition