The Surgery & Emergency Services Pavilion (SESP) OR Integration Modernization Project would address needed upgrades to the OR Lights/Monitor booms due to boom failures beyond the ability to repair and/or replace parts. In the SESP, the project will upgrade the OR Audio/Visual Technology within the twenty-four (24) Operating Room including combining the AV network head end equipment into one new centralized AV Room. Two (2) of the twenty-four (24) Operating Rooms will require conversion to Cardiovascular Operating Rooms (CVOR’s), two (2) of the twenty-four (24) Operating Rooms will require conversion to Flex-Case Operating Rooms (FCOR’s) and one (1) will require conversion to a Hybrid OR. These modifications require reconfiguration of the rooms boom orientations, structural components, med gas needs, laminar air flow and technology upgrades. Replacement of headwalls in 63 preop/ pacu bays along with renovation of the ICU/ Surgery waiting room are also included in the scope.