The overall responsibility and scope of work for the selected engineering firm is to prepare comprehensive engineering services to allow the Court to properly evaluate the site prior to the acquisition of the Property. The engineering services requested will be: a. ALTA Survey: An ALTA survey will need to be conducted on the entire acreage per the American Land Title Association and the American Congress of Surveying and Mapping to understand the boundaries of the Property and any existing easements. The title search for the Property will be provided. b. Geotechnical Evaluation: A Geotechnical Evaluation will need to be completed on the Property. A minimum of fifty (50) soil test borings will be required. Consider an adder fee for ten (10) additional borings at the direction of the Court. c. Phase 1 Environmental Site Assessment: A Phase 1 Environmental Site Assessment will need to be performed in compliance with the American Society for Testing and Materials Practice E 1527-13. d. Wetlands Survey and Assessment: The site will need to be assessed for wetlands and a survey will need to be completed following regulations by the United States Army Corps of Engineers and Kentucky Department of Environmental Protection. e. Archaeological Survey: Evaluation of the site for archaeological or historical markings on the Property following corresponding Kentucky regulations. f. Topographic Survey and Grading Model: The site will need a topographic map to determine the cut and fill necessary to grade the site. A grading model will also need to be prepared. g. Site Design and Master Planning: Prepare three conceptual master plans addressing square footage on the Property, building placement, roadway design, business park access, and utility (i.e. water, wastewater, natural gas, etc.) line placement.